n11-48-32 (Bldg 131)
–Building Transfer to VA complete
n12-86-32 (Bldg 130)
–Metal stud framing on-going
–MEPF rough-in started
n11-49-32 (Bldg 129)
–Building Transfer to VA complete
n12-85-32 (Bldg 128)
–MEPF rough-in ongoing
–Metal and wood stud framing ongoing
–Brick point and tuck ongoing
n11-47-32 (Bldg 125)
–Building Transfer to VA complete